Client | Site/Project | Description of works |
---|---|---|
Neo Structo | HPCL-Mumbai | · Fabrication & Erection of Piping |
· New Treated Hexane Project | · Fabrication & Erection of Structural Steel | |
· MS Maximization Project | · Equipment Erection and Alignment works | |
· Dewaxing Project | ||
· Cooling Tower Replacement Project | ||
Neo Structo | Hindalco Dahej, Gujarat | Fabrication and Erection of SS Converter (Consultant: Monsanto) |
Neo Structo | IPCL-Baroda / Turn around Job in Naphtha Heaters | Fabrication and Erection of |
· Flue Gas Ducts | ||
· Trestle structure | ||
· Heater Coil works | ||
Neo Structo | Praxair/Tata-II, Jamshedpur - ASU (2x900TPD) | · Fabrication & Erection of Double wall LR Tanks (2nos.) |
· Erection of Cold Box and associated field works | ||
& | · Erection & Alignment of Static & Rotary Equipments | |
· Warm end Piping Fabrication and Erection works | ||
Praxair/SAIL, Durgapur - ASU (700TPD) | ||
Neo Structo | Technip/IOCL-Gujarat Refinery - | · Fabrication and Erection of Piping, Structural works |
NHT/ISOM/NSU/Penex Units | · Mechanical Equipment Erection and Alignment works | |
Petron | IOCL-Panipat Refinery / NCU Project | Fabrication & Erection of Piping, Equipment Erection works |
Petron | HMEL Bathinda Refinery | CDU/VDU Heater - Structural Fabrication & Erection works |
Larsen & Toubro | HMEL Bathinda Refinery | Fabrication & Erection of Piping works in FCCU |
Neo Structo | Tata Chemicals, Babrala unit / Turn around Project Cap enhancement of Urea & Ammonia units | Fabrication and Erection of CS, SS and Urea grade Piping during Pre-shutdown and Shutdown |
Neo Structo | HPCL Vizag Refinery / FCCU Revamp Project Regenerator & Reactor Revamp job | · Dismantling of Ducts, Equipment, Structure, Piping |
· Fabrication and Erection of Ducts, Structure, Piping | ||
· Equipment erection works | ||
Neo Structo | GNFC Bharuch, /Ammonia Synthesis Proj | Fabrication & Erection of Piping |
Neo Structo | Technip/BPCL Mumbai / CRU Heater Turnaround | · Dismantling of Non-pressure and Pressure Parts |
· Erection of Non-pressure and Pressure parts including hydrotesting and commissioning assistance | ||
Cairn Energy | Cairn-Mangala Processing Terminal, Barmer, Rajasthan | Piping fabrication and erection works. Part of jobs executed during shutdown. |
Fernas /OPAL | Opal-Dahej / Utilities and Fire Water Spray System | Fabrication and Erection of Offsite Piping, Fire water Spray piping around Horton Spheres |
Larsen & Toubro | RIL-Dahej Unit / Ethane Receiving and Storage Project | Fabrication and Erection of Piping |
Air Liquide | Bhushan Steel, Angul /Air Separation Unit - 700TPD | Fabrication & Erection of Piping works |
Air Liquide | JSPL, Angul / Air Separation Unit - 2x1250TPD | Complete Mechanical, Piping and Structural steel works + Erection of Cold Box |
Air Liquide | AL Holding, Pune / Air Separation Unit - 210 TPD | Complete Mechanical, Piping and Structural steel works + Erection of Cold Box |
Tata Projects | JSPL Angul / Coke Oven, RMHS & Utility Project | Erection, Alignment and Welding of Building & Technological Structure |
Reliance | J3-Jamnagar Project/Units: Algaetec, MEG, ROGC, PX4 & LLDPE | Mechanical, Piping works |